Upcoming Mumbai Metro lines

Metro lines being built in Mumbai, their planned stations, and the Monorail.

These lines are not open. Station names are the planned names and may change before opening.

Line 2B (rest)

D N Nagar to Chembur, 14 stations. Under construction.

Planned stations
  1. ESIC Nagar
  2. Prem Nagar
  3. Indira Nagar
  4. Nanawati Hospital
  5. Khira Nagar
  6. Saraswat Nagar
  7. National College
  8. Bandra
  9. ITO
  10. ILFS
  11. MTNL
  12. S.G Barve Marg
  13. Kurla East
  14. EEH

Line 2B guide

Line 4 and 4A

Wadala (Bhakti Park) to Gaimukh, 32 stations, about 35 km. The first section, Gaimukh to Cadbury Junction, is targeted for December 2026.

Planned stations
  1. Bhakti Park
  2. Wadala T.T.
  3. Anik Bus Stop
  4. Siddarth Nagar
  5. Garodia Nagar
  6. Pant Nagar
  7. Laxmi Nagar
  8. Shreyas Cinema
  9. Godrej Colony
  10. Vikhroli
  11. Surya Nagar
  12. Gandhi Nagar
  13. Naval Housing
  14. Bhandup Mahapalika
  15. Bhandup
  16. Shangrila
  17. Sonapur
  18. Mulund Fire Station
  19. Mulund Naka
  20. Teen Haath Naka
  21. RTO Thane
  22. Mahapalika Marg
  23. Cadbury Junction
  24. Majiwada
  25. Kapurbawdi
  26. Manpada
  27. Tikuji Wadi
  28. Dongaripada
  29. Vijay Garden
  30. Kasarvadavli
  31. Gownipada
  32. Gaimukh

Line 4 guide

Line 4A guide

Line 5

Thane (Kapurbawdi) to Kalyan, 14 stations.

Planned stations
  1. Balkum Naka
  2. Kasheli
  3. Kalhar
  4. Purna
  5. Anjurphata
  6. Dhamankar Naka
  7. Bhiwandi
  8. Gopal Nagar
  9. Temghar
  10. Rajnouli Village
  11. Gove Gaon MIDC
  12. Kon Gaon
  13. Kalyan
  14. APMC Kalyan

Line 5 guide

Line 6

Swami Samarth Nagar to Vikhroli (EEH), 13 stations, about 14.5 km.

Planned stations
  1. Swami Samarth Nagar
  2. Adarsh Nagar
  3. Jogeshwari
  4. JVLR
  5. Shyam Nagar
  6. Mahakali Caves
  7. Seepz Village
  8. Saki Vihar Road
  9. Rambaug
  10. Powai Lake
  11. IIT Powai
  12. Kanjurmarg
  13. Vikhroli (EEH)

Line 6 guide

Line 7A

Gundavali to Mumbai Airport Terminal 2, 2 stations.

Planned stations
  1. Airport Colony
  2. CSIA (International)

Line 7A guide

Line 9 (rest)

Kashigaon to Subhash Chandra Bose Stadium (Bhayandar), 4 stations. Under construction.

Planned stations
  1. Sai Baba Nagar
  2. Deepak Hospital
  3. Shahid Bhagat Singh Garden
  4. Subhash Chandra Bose Stadium

Line 9 guide

Line 10

Gaimukh to Shivaji Chowk (Mira Road), 4 stations.

Planned stations
  1. Gaimukh Reti Bandar
  2. Varsova Char Phata
  3. Kashimira
  4. Shivaji Chowk (Mira Road)

Line 10 guide

Line 11

Wadala (Bhakti Park) to CSMT, 11 stations.

Planned stations
  1. Chhatrapati Shivaji Maharaj Terminus
  2. Carnac Bunder
  3. Clock Tower
  4. Wadi Bunder
  5. Darukhana
  6. Coal Bunder
  7. Hay Bunder
  8. Sewri Metro
  9. BPT Hospital
  10. Ganesh Nagar
  11. Wadala (Bhakti Park)

Line 11 guide

Line 12

Kalyan to Taloja, 19 stations, about 20.8 km.

Planned stations
  1. Kalyan
  2. APMC Kalyan
  3. Ganesh Nagar
  4. Pisavali
  5. Golavali
  6. Dombivali
  7. Sagaon
  8. Sonarpada
  9. Manpada
  10. Hedutane
  11. Kolegaon
  12. Nilje Gaon
  13. Vadavali
  14. Bale
  15. Waklan
  16. Turbhe
  17. Pisarve Depot
  18. Pisarve
  19. Amandoot

Line 12 guide

Mumbai Monorail

17 stations from Chembur to Sant Gadge Maharaj Chowk. Suspended since 20 September 2025; no reopening date has been announced.

Monorail stations
  1. Chembur
  2. VNP & RC Marg
  3. Fertilizer Township
  4. Bharat Petroleum
  5. Mysore Colony
  6. Bhakti Park
  7. Wadala Depot
  8. GTB Nagar
  9. Antop Hill
  10. Acharya Atre Nagar
  11. Wadala Bridge
  12. Dadar East
  13. Naigaon
  14. Ambedkar Nagar
  15. Mint Colony
  16. Lower Parel
  17. Sant Gadge Maharaj Chowk

Planned, not open

The lines on this page come from their design plans. Where the data records a target date it is shown as a target; otherwise no date is given. No planned line appears in the planner until it opens.

Questions

When will Mumbai Metro Line 4 open?

The first section, Gaimukh to Cadbury Junction, is targeted for December 2026. No opening date has been announced for the rest of the line.

Is the Mumbai Monorail running?

No. The Monorail has been suspended since 20 September 2025, and no reopening date has been announced.

Which new metro line will link to the Aqua Line?

Line 6 is planned to meet the Aqua Line at Aarey JVLR, and Line 7A to reach the airport. Line 2B is planned to reach BKC.