Mumbai Metro Line 11 (planned)
Wadala (Bhakti Park) to CSMT: planned stations, the line's design plan and where it is planned to link up.
Line 11 is not open. No opening date is given on this site until one is announced. It is not in the route planner.
Planned stations
Wadala (Bhakti Park) to CSMT: 11 stations in the current station list. Names may change before opening.
Listed from Wadala (Bhakti Park), shared with Line 4, to CSMT, following the DPR; there are no station markers for it.
- 1Wadala (Bhakti Park) · also Line 4
- 2Ganesh Nagar
- 3BPT Hospital
- 4Sewri Metro
- 5Hay Bunder
- 6Coal Bunder
- 7Darukhana
- 8Wadi Bunder
- 9Clock Tower
- 10Carnac Bunder
- 11Chhatrapati Shivaji Maharaj Terminus
Station order diagram (not to scale)
Schematic: the stations in order, evenly spaced. There are no station markers for this line, so it is not a map: it shows no positions, distances or track. A ring marks a station open today.
From the Detailed Project Report
Design figures from the September 2018 Detailed Project Report (Wadala to CSMT Metro). The line as built can differ: the report's station count and the current station list do not always match.
- Planned length
- 12.774 kmin the September 2018 DPR
- Planned stations
- 104.009 km elevated, 8.765 km underground; 2 elevated and 8 underground stations
- Depot
- Not given here
Route
Continues the Line 4 corridor from Wadala (Bhakti Park) south to CSMT.
What this means today
No opening date is recorded, and the planner does not route journeys on it.
Questions
Is Mumbai Metro Line 11 open?
No. No opening date is given on this site until one is announced. The route planner does not include it.
What are the stations on Mumbai Metro Line 11?
Line 11 is planned from Wadala (Bhakti Park) to CSMT with 11 stations in the current station list: Wadala (Bhakti Park), Ganesh Nagar, BPT Hospital, Sewri Metro, Hay Bunder, Coal Bunder, Darukhana, Wadi Bunder, Clock Tower, Carnac Bunder and Chhatrapati Shivaji Maharaj Terminus. Names may change before opening.
How long is Mumbai Metro Line 11?
The September 2018 Detailed Project Report gives 12.774 km and 10 stations (4.009 km elevated, 8.765 km underground; 2 elevated and 8 underground stations). These are design figures and may change as the line is built.