Mumbai Metro Line 12 (planned)
Kalyan to Amandoot: planned stations, the line's design plan and where it is planned to link up.
Line 12 is not open. No opening date is given on this site until one is announced. It is not in the route planner.
Planned stations
Kalyan to Amandoot: 19 stations in the current station list. Names may change before opening.
The DPR names the line Kalyan to Taloja; the station markers end at Amandoot. The list follows the markers.
- 1Kalyan · also Line 5
- 2APMC Kalyan
- 3Ganesh Nagar
- 4Pisavali
- 5Golavali
- 6Dombivali
- 7Sagaon
- 8Sonarpada
- 9Manpada
- 10Hedutane
- 11Kolegaon
- 12Nilje Gaon
- 13Vadavali
- 14Bale
- 15Waklan
- 16Turbhe
- 17Pisarve Depot
- 18Pisarve
- 19Amandoot
Map (approximate)
Approximate map: the stations are placed by their planned station markers and joined by straight lines, so this is not the track or a final alignment. A ring marks a station open today.
From the Detailed Project Report
Design figures from the April 2019 Detailed Project Report (Kalyan to Taloja). The line as built can differ: the report's station count and the current station list do not always match.
- Planned length
- 20.756 kmin the April 2019 DPR
- Planned stations
- 17entirely elevated
- Depot
- Not given here
Route
From Kalyan to Taloja, where the DPR plans a link with the Navi Mumbai metro.
What this means today
The plan includes a link with the Navi Mumbai metro, which MetroTrip does not cover yet. It is not open, so the planner does not route journeys on it.
Questions
Is Mumbai Metro Line 12 open?
No. No opening date is given on this site until one is announced. The route planner does not include it.
What are the stations on Mumbai Metro Line 12?
Line 12 is planned from Kalyan to Amandoot with 19 stations in the current station list: Kalyan, APMC Kalyan, Ganesh Nagar, Pisavali, Golavali, Dombivali, Sagaon, Sonarpada, Manpada, Hedutane, Kolegaon, Nilje Gaon, Vadavali, Bale, Waklan, Turbhe, Pisarve Depot, Pisarve and Amandoot. Names may change before opening.
How long is Mumbai Metro Line 12?
The April 2019 Detailed Project Report gives 20.756 km and 17 stations (entirely elevated). These are design figures and may change as the line is built.