Mumbai Metro Line 7A (planned)

Gundavali (Andheri East) to Airport Terminal 2: planned stations, the line's design plan and where it is planned to link up.

Line 7A is not open. No opening date is given on this site until one is announced. It is not in the route planner.

Planned stations

Gundavali (Andheri East) to Airport Terminal 2: 2 stations in the current station list. Names may change before opening.

Line 7A starts at Gundavali, a Line 7 station open today, which is not one of its own new stations.

  1. ·Gundavali · open today (Line 7), not a new station
  2. 1Airport Colony
  3. 2CSIA (International)

Map (approximate)

GundavaliCSIA (International)Airport Colony

Approximate map: the stations are placed by their planned station markers and joined by straight lines, so this is not the track or a final alignment. A ring marks a station open today.

From the Detailed Project Report

Design figures from the October 2017 Detailed Project Report (Extension of Line 7 from Andheri (E) to the international airport). The line as built can differ: the report's station count and the current station list do not always match.

Planned length
3.175 kmin the October 2017 DPR
Planned stations
20.98 km elevated, 2.195 km underground; one elevated and one underground station
Depot
Not given here

Route

An extension of Line 7 from Gundavali to the international airport.

  • Gundavali: Line 7A is planned as an extension of Line 7 from Andheri (East), where Gundavali station is.
  • Airport T2: The Aqua Line station information lists Line 7A at the airport.

What this means today

Gundavali, where it would start, is an open Line 7 station, and the Aqua Line's station information lists Line 7A at Terminal 2. It is not open, so the planner does not route journeys on it.

Questions

Is Mumbai Metro Line 7A open?

No. No opening date is given on this site until one is announced. The route planner does not include it.

What are the stations on Mumbai Metro Line 7A?

Line 7A is planned from Gundavali (Andheri East) to Airport Terminal 2 with 2 stations in the current station list: Airport Colony and CSIA (International). Names may change before opening.

How long is Mumbai Metro Line 7A?

The October 2017 Detailed Project Report gives 3.175 km and 2 stations (0.98 km elevated, 2.195 km underground; one elevated and one underground station). These are design figures and may change as the line is built.

Will Line 7A connect with lines open today?

Line 7A is planned as an extension of Line 7 from Andheri (East), where Gundavali station is. The Aqua Line station information lists Line 7A at the airport.