Mumbai Metro Line 4A (planned)
Kasarvadavali to Gaimukh: planned stations, the line's design plan and where it is planned to link up.
Line 4A is not open. The first section (Gaimukh to Cadbury Junction, with Line 4) is targeted for December 2026. It is not in the route planner.
Planned stations
Kasarvadavali to Gaimukh: 3 stations in the current station list. Names may change before opening.
Kasarvadavli is the last station of Line 4 and the start of Line 4A; Line 4A adds the stations after it.
- 1Kasarvadavli · also Line 4
- 2Gownipada
- 3Gaimukh
Map (approximate)
Approximate map: the stations are placed by their planned station markers and joined by straight lines, so this is not the track or a final alignment. A ring marks a station open today.
From the Detailed Project Report
Design figures from the October 2017 Detailed Project Report (Extension of Line 4 from Kasarvadavali to Gaimukh). The line as built can differ: the report's station count and the current station list do not always match.
- Planned length
- 2.668 kmin the October 2017 DPR
- Planned stations
- 2entirely elevated
- Depot
- Near Gaimukh, for the whole Wadala–Gaimukh corridor
Route
An extension of Line 4; Line 10 is planned onward from Gaimukh to Mira Road.
What this means today
The depot for the whole Wadala–Gaimukh corridor is planned near Gaimukh. Until trains run, the planner does not route journeys on it.
Questions
Is Mumbai Metro Line 4A open?
No. The first section (Gaimukh to Cadbury Junction, with Line 4) is targeted for December 2026. The route planner does not include it.
What are the stations on Mumbai Metro Line 4A?
Line 4A is planned from Kasarvadavali to Gaimukh with 3 stations in the current station list: Kasarvadavli, Gownipada and Gaimukh. Names may change before opening.
How long is Mumbai Metro Line 4A?
The October 2017 Detailed Project Report gives 2.668 km and 2 stations (entirely elevated). These are design figures and may change as the line is built.