BKC to Dahisar East metro route

22 stops, change at Marol Naka; walk to Gundavali, about 63 min, about ₹90.

Change stations

Aqua Linefrom Bandra-Kurla Complex

Board the train towards

Aarey JVLR

Then

  • Change at Marol Naka
  • Walk to Gundavali
Estimated fare
₹903 tickets: Aqua Line ₹40 + Line 1 ₹20 + Line 2A/7/9/2B ~₹30. Worked out from the distance steps: the machine shows the exact fare. Fares
Journey time
about 63 min52 min on trains, 11 min walking and changing, plus waiting (weekday midday, a train every 8 min at BKC; every 7 min at Marol Naka; every 9 min at Gundavali)
Stops
22after boarding
Changes
2change at Marol Naka; walk to Gundavali

How to make this journey

Dahisar East is where Lines 2A, 7 and 9 meet, with changes inside the station on one ticket.

No single line links BKC and Dahisar East: the journey uses the Aqua Line, Line 1 and Line 7, with a walk between two stations. You need a separate ticket for each ticket system the journey crosses, 3 in all.

Where to board at BKC

At BKC, take an Aqua Line train towards Aarey JVLR from platform 2B. On the way the train calls at Santacruz (for Santacruz railway station), Mumbai Airport Terminal 1 (the other airport terminal) and Mumbai Airport Terminal 2 (the other airport terminal): stay on board.

Changing trains

At Marol Naka, leave the Aqua Line station by exit A1 and go up to the Line 1 station next door, about 16 m away. The two stations have separate ticket systems, so buy a Line 1 ticket before you go through the Line 1 gates; allow about 5 minutes. Then board a Line 1 train towards Versova; check the end station on the platform sign.

Leave Western Express Highway station and walk to Gundavali station (about 115 m apart in a straight line); allow about 6 minutes. The walk is on the street, outside both stations, so you pass the ticket gates twice. Gundavali is the end of Line 7, so every train leaving it goes your way, towards Kashigaon.

Marol Naka interchange guide

Western Express Highway and Gundavali interchange guide

Tickets and fare

About ₹90 one way (3 tickets: Aqua Line ₹40 + Line 1 ₹20 + Line 2A/7/9/2B ~₹30, because the lines belong to different companies).

Arriving at Dahisar East

Exits at Dahisar East are not recorded yet, so follow the exit signs inside the station for your area.

Coming back

For the way back, start at Dahisar East. Dahisar East is the end of Line 7, so every train leaving it goes your way, towards Gundavali. At Gundavali, walk to Western Express Highway and take a Line 1 train towards Ghatkopar, with a new ticket. At Marol Naka, go down from the Line 1 station to Aqua Line exit A1, buy an Aqua Line ticket and take a train towards Cuffe Parade from platform 1. With changes, the last journey back leaves earlier than each line's last train: see First and last trains on the return guide.

Dahisar East to BKC route guide

Your journey, stop by stop

  1. Bandra-Kurla Complex

    Board the Aqua Line train towards Aarey JVLR. Platform signs show the end station.

  2. Ride 6 stops (about 13 min)

    5 stations in between
    1. Bandra Colony
    2. Santacruz Metro
    3. CSMI Airport T1
    4. Sahar Road
    5. CSMI Airport T2
  3. Marol NakaChange

    The Line 1 and Aqua Line stations are side by side, linked at exit A1 of the Aqua Line station. Leave through the gates, buy a new ticket and board the train towards Versova. Allow about 5 minutes.

  4. Ride 3 stops (about 5 min)

    2 stations in between
    1. Airport Road
    2. Chakala (J B Nagar)
  5. Western Express HighwayChange

    Leave the station and walk to Gundavali station on Line 7 (about 6 min). Buy a new ticket there and board the train towards Kashigaon.

  6. Dahisar (East)Get off

    Your destination.

Route on the metro map

StartBKCChangeMarol NakaChangeWEHGet offDahisar (E)

Full Mumbai Metro map

First and last trains

Estimates, not individual train times, with 3 minutes spare at each change; ~ = estimated. How these times are worked out

DayFirst journeyLast journey
Monday to FridayLeave ~06:30, arrive ~07:45Leave by ~22:18, arrive ~23:30
SaturdayLeave ~06:30, arrive ~07:45Leave by ~22:14, arrive ~23:30
Sunday and holidaysLeave ~06:30, arrive ~07:43Leave by ~22:10, arrive ~23:23

On that route, trains leave BKC until about 11:05 pm, but later ones would miss the last onward train.

Fare

₹90one way, 3 tickets, estimated

This is an estimate worked out from the distance steps; the ticket machine shows the exact fare.

  • Aqua Line: BKC to Marol Naka₹40
  • Line 1: Marol Naka to WEH₹20
  • Lines 2A, 7, 9 and 2B: Gundavali to Dahisar (E)~₹30

The lines on this trip belong to different companies, so you buy a ticket for each part.

Mumbai Metro fares and tickets

Areas around Dahisar (E)

On Western Express Highway; the line's design plan places the station on the highway's western side.

  • Avadhut Nagar
  • CS Complex
  • Shakti Nagar
  • Penkarpada
  • Dharkhadi
  • Ketkipada
  • Maratha Colony
  • N.I Complex

Dahisar East station guide

Questions about this journey

Which metro do I take from BKC to Dahisar East?

Take the Aqua Line train towards Aarey JVLR from BKC. Change at Marol Naka to Line 1 towards Versova. Walk to Gundavali (about 6 min) for Line 7 towards Kashigaon. Platform signs show the end station.

Do I need to change trains from BKC to Dahisar East?

Yes, change at Marol Naka, then walk to Gundavali.

How many stops is Dahisar East from BKC?

Dahisar East is 22 stops after BKC.

What is the metro fare from BKC to Dahisar East?

About ₹90 one way (3 tickets: Aqua Line ₹40 + Line 1 ₹20 + Line 2A/7/9/2B ~₹30, because the lines belong to different companies). This is an estimate worked out from the distance steps; the ticket machine shows the exact fare.

How far is Dahisar East from BKC by metro?

About 26.5 km along the lines, between station centres. Approximate: distances on Line 1 and Line 7 come from straight lines between the stations, scaled to the planned length. The walk between stations is not included.

How long does the metro take from BKC to Dahisar East?

About 63 minutes including walking and changing, plus waiting: on a weekday at midday a train comes every 8 min at BKC; every 7 min at Marol Naka; every 9 min at Gundavali.

When is the first and last metro from BKC to Dahisar East?

Monday to Friday, the first journey leaves BKC at about 6:30 am (arriving about 7:45 am) and the last leaves by about 10:18 pm (arriving about 11:30 pm). Saturday, the first journey leaves BKC at about 6:30 am (arriving about 7:45 am) and the last leaves by about 10:14 pm (arriving about 11:30 pm). Sunday and holidays, the first journey leaves BKC at about 6:30 am (arriving about 7:43 am) and the last leaves by about 10:10 pm (arriving about 11:23 pm). These are estimates from the timetable: be on the platform a few minutes early.

More routes

Return journey: Dahisar East to BKC

All route guides