Mumbai Airport Terminal 1 to Versova metro route
10 stops, change at Marol Naka, about 24 min, ₹50.
Change stations
Aqua Linefrom CSMI Airport T1
Board the train towards
Aarey JVLR
Then
- Change at Marol Naka
- Fare
- ₹50Two tickets: Aqua Line ₹20 + Line 1 ₹30. Fares
- Journey time
- about 24 min19 min on trains, 5 min walking and changing, plus waiting (weekday midday, a train every 8 min at Airport T1; every 7 min at Marol Naka)
- Stops
- 10after boarding
- Changes
- 1change at Marol Naka
How to make this journey
Versova is the western end of Line 1, for Four Bungalows, Seven Bungalows and Yari Road.
No single line links Mumbai Airport Terminal 1 and Versova: the journey uses the Aqua Line and Line 1. You need a separate ticket for each ticket system the journey crosses, 2 in all.
Where to board at Mumbai Airport Terminal 1
Starting at the airport: from Terminal 1, follow the metro signs to the station; exit A1 is the recorded route between the terminal and the station, with a lift. At Mumbai Airport Terminal 1, take an Aqua Line train towards Aarey JVLR from platform 2. On the way the train calls at Mumbai Airport Terminal 2 (the other airport terminal): stay on board.
Changing trains
At Marol Naka, leave the Aqua Line station by exit A1 and go up to the Line 1 station next door, about 16 m away. The two stations have separate ticket systems, so buy a Line 1 ticket before you go through the Line 1 gates; allow about 5 minutes. Then board a Line 1 train towards Versova; check the end station on the platform sign. On the way the train calls at Western Express Highway (change for Line 7), Andheri (for Andheri railway station) and D N Nagar (change for Line 2A): stay on board. In the evening peak some trains from Ghatkopar end at Andheri; if yours shows Andheri on its sign, change to the next train there.
Tickets and fare
₹50 one way (Two tickets: Aqua Line ₹20 + Line 1 ₹30, because the lines belong to different companies).
Arriving at Versova
At Versova, gate 1 leads to the Seven Bungalows bus depot and gate 3 towards Model Town and Kokilaben Hospital; gate 6 is the Yari Road side.
Coming back
For the way back, start at Versova. Versova is the end of Line 1, so every train leaving it goes your way, towards Ghatkopar. At Marol Naka, go down from the Line 1 station to Aqua Line exit A1, buy an Aqua Line ticket and take a train towards Cuffe Parade from platform 1. With changes, the last journey back leaves earlier than each line's last train: see First and last trains on the return guide.
Your journey, stop by stop
Board the Aqua Line train towards Aarey JVLR. Platform signs show the end station.
Ride 3 stops (about 6 min)
2 stations in between
Marol NakaChange
The Line 1 and Aqua Line stations are side by side, linked at exit A1 of the Aqua Line station. Leave through the gates, buy a new ticket and board the train towards Versova. Allow about 5 minutes.
Ride 7 stops (about 13 min)
6 stations in between
VersovaGet off
Your destination.
Route on the metro map
First and last trains
Estimates, not individual train times, with 3 minutes spare at each change; ~ = estimated. How these times are worked out
| Day | First journey | Last journey |
|---|---|---|
| Monday to Friday | Leave ~06:37, arrive ~07:08 | Leave by ~23:12, arrive ~23:42 |
| Saturday | Leave ~06:37, arrive ~07:08 | Leave by ~23:12, arrive ~23:42 |
| Sunday and holidays | Leave ~06:37, arrive ~07:08 | Leave by ~23:12, arrive ~23:42 |
Fare
₹50one way, 2 tickets
- Aqua Line: Airport T1 to Marol Naka₹20
- Line 1: Marol Naka to Versova₹30
The lines on this trip belong to different companies, so you buy a ticket for each part.
Exits at Versova
Exits at Versova and where they lead
Gate 1
Near 7 Bungalows bus depot
Stairs
Gate 2
Escalator up
Gate 3
Near Model Town, Towards Kokilaben Hospital
Stairs
Gates 4 & 5
Near Bon Bon Shoes
4Stairs
5Escalator up
Gate 6
Near Yari road
Stairs
2 lifts, not at a numbered gate: between gates 1 and 2; between gates 5 and 6.
Before you travel
- Coming from Airport Terminal 1. Exit A1, about 287 m, lift, the exit list also names the terminal at exit B1 (a label two different exits share: follow the signs).
Questions about this journey
Which metro do I take from Mumbai Airport Terminal 1 to Versova?
Take the Aqua Line train towards Aarey JVLR from Mumbai Airport Terminal 1. Change at Marol Naka to Line 1 towards Versova. Platform signs show the end station.
Do I need to change trains from Mumbai Airport Terminal 1 to Versova?
Yes, change at Marol Naka.
How many stops is Versova from Mumbai Airport Terminal 1?
Versova is 10 stops after Mumbai Airport Terminal 1.
What is the metro fare from Mumbai Airport Terminal 1 to Versova?
₹50 one way (Two tickets: Aqua Line ₹20 + Line 1 ₹30, because the lines belong to different companies).
How far is Versova from Mumbai Airport Terminal 1 by metro?
About 10.6 km along the lines, between station centres. Approximate: distances on Line 1 come from straight lines between the stations, scaled to the planned length.
How long does the metro take from Mumbai Airport Terminal 1 to Versova?
About 24 minutes including walking and changing, plus waiting: on a weekday at midday a train comes every 8 min at Mumbai Airport Terminal 1; every 7 min at Marol Naka.
When is the first and last metro from Mumbai Airport Terminal 1 to Versova?
Monday to Friday, the first journey leaves Mumbai Airport Terminal 1 at about 6:37 am (arriving about 7:08 am) and the last leaves by about 11:12 pm (arriving about 11:42 pm). Saturday, the first journey leaves Mumbai Airport Terminal 1 at about 6:37 am (arriving about 7:08 am) and the last leaves by about 11:12 pm (arriving about 11:42 pm). Sunday and holidays, the first journey leaves Mumbai Airport Terminal 1 at about 6:37 am (arriving about 7:08 am) and the last leaves by about 11:12 pm (arriving about 11:42 pm). These are estimates from the timetable: be on the platform a few minutes early.
More routes
Return journey: Versova to Mumbai Airport Terminal 1