Hyderabad Metro lines

3 lines, 57 stations and about 69 km of track, every station elevated. Choose a line to see every station in order.

Red Line Miyapur to LB Nagar

Corridor 1: 27 stations over 29.2 km, about 48 minutes from one end to the other. Opened in 2 stages: Miyapur to Ameerpet on 29 November 2017; Ameerpet to LB Nagar on 24 September 2018.

Change at Ameerpet for the Blue Line; MG Bus Station for the Green Line.

Red Line: every station in order

Blue Line Nagole to Raidurg

Corridor 3: 23 stations over 27 km, about 50 minutes from one end to the other. Opened in 3 stages: Nagole to Ameerpet on 29 November 2017; Ameerpet to HITEC City on 20 March 2019; HITEC City to Raidurg on 29 November 2019.

Change at Ameerpet for the Red Line; Parade Ground and JBS Parade Ground (walkway) for the Green Line.

Blue Line: every station in order

Green Line JBS Parade Ground to MG Bus Station

Corridor 2: 9 stations over 11 km, about 16 minutes from one end to the other. Opened in one stage: JBS Parade Ground to MG Bus Station on 8 February 2020.

Change at MG Bus Station for the Red Line; Parade Ground and JBS Parade Ground (walkway) for the Blue Line.

Green Line: every station in order

See it on the map

Hyderabad Metro map

Questions about the lines

How many lines does the Hyderabad Metro have?

3 lines: Red Line (Miyapur to LB Nagar), Blue Line (Nagole to Raidurg), Green Line (JBS Parade Ground to MG Bus Station), with 57 stations and about 69 km of track.

Which is the longest Hyderabad Metro line?

The Red Line, 29.2 km from Miyapur to LB Nagar.

When did the Hyderabad Metro open?

The first sections opened on 29 November 2017. The last section, the Green Line, opened on 8 February 2020.